Process
Dae Sun Shipbuilding will provide the best products and services
that meet customer needs with progressive and active thinking.
-

STEP 01. Contract
We are formalizing the contract with the client.
-

STEP 02. Cutting
Steel cutting and processing are performed off-site.
-

STEP 03. Sub assembly
The processed steel is stored in-house and then undergoes sub-assembly.
-

STEP 04. Assembly
The steel plates ard assembled to a block by welding.
-

STEP 05. Pre outfitting
The grand assembly is followed by the pre-outfitting process for various systems (piping, steel structures, machinery, and electricity).
-

STEP 06. Pre erection
Pre-Erection (P.E.) is carried out on blocks that have completed the assembly and pre-outfitting stages.
-

STEP 07. Pre erection outfitting
Internal outfitting is conducted for the blocks following the Pre-Erection (P.E.) stage.
-

STEP 08. Painting
The entire outer surface of the block undergoes painting.
-

STEP 09. Delivery
The blocks are loaded and delivered to the client.