Change & Innovation, Challenge - DAESUN Shipbuilding & Engineering Co., Ltd.

Process

Dae Sun Shipbuilding will provide the best products and services
that meet customer needs with progressive and active thinking.

  • Contract

    STEP 01. Contract

    We are formalizing the contract with the client.

  • Cutting

    STEP 02. Cutting

    Steel cutting and processing are performed off-site.

  • Sub assembly

    STEP 03. Sub assembly

    The processed steel is stored in-house and then undergoes sub-assembly.

  • Assembly

    STEP 04. Assembly

    The steel plates ard assembled to a block by welding.

  • Pre outfitting

    STEP 05. Pre outfitting

    The grand assembly is followed by the pre-outfitting process for various systems (piping, steel structures, machinery, and electricity).

  • Pre erection

    STEP 06. Pre erection

    Pre-Erection (P.E.) is carried out on blocks that have completed the assembly and pre-outfitting stages.

  • Pre erection outfitting

    STEP 07. Pre erection outfitting

    Internal outfitting is conducted for the blocks following the Pre-Erection (P.E.) stage.

  • Painting

    STEP 08. Painting

    The entire outer surface of the block undergoes painting.

  • Delivery

    STEP 09. Delivery

    The blocks are loaded and delivered to the client.